Tonight’s work involved adding a lower level of horizontal stringers to the formers to provide rigidity for the fuelselage. A second level of stabilizers will be added to the top corners of the rounded fuelselage. At this point, the perspective down the axis of the plane bears resembelance to a cobra ready to strike.