Before beginning construction of the fuelselage, we wanted to test fire our ducted fans. We have soldered them to 14 guage electrical wire and tied them all in series. Our main power feeds will run down the center of the plane within the fuelselage. All of our connections will be covered by the top of the wing, once assembled.

xb-70_01202008_07.jpg xb-70_01202008_11.jpg
xb-70_01202008_12.jpg xb-70_01202008_10.jpg